High Capability Szs Industrial Gas Boilers

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :High Capability Szs Industrial Gas Boilers
  • Supply Capacity : 10 units/month :High Capability Szs Industrial Gas Boilers
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

boilermanufactory

Get display discount

boiler
Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Economics | PDF | Heat Transfer - Scribd

    Specific volume of steam 100 psia v=4.432 ft3/lb. A.3 in C. 4 in B.5 in D. 6 in A boiler plant generates 225,000 lbs of steam and burns 13.9 tons of coal per hour. The coal has a heating value 11,400 BTU/lb. A test of the particulates leaving the boiler shows that 3,804 lb of particulate is being discharged per hour.Get Price

  • INCREASING THE ENERGY EFFICIENCY OF BOILER AND HEATER

    Recent examples: A chemical plant is saving $500,000 per year by checking for, and replacing, all leaking steam traps. A plywood plant reduced its steam load by 2700 kg/h (6000 lb./h) by upgrading its piping insulation. Lowering the systems steam pressure or water temperature to what the involved processes actually need can also reduce energy consumption.Get Price

  • Economics | PDF | Heat Transfer - Scribd

    Specific volume of steam 100 psia v=4.432 ft3/lb. A.3 in C. 4 in B.5 in D. 6 in A boiler plant generates 225,000 lbs of steam and burns 13.9 tons of coal per hour. The coal has a heating value 11,400 BTU/lb. A test of the particulates leaving the boiler shows that 3,804 lb of particulate is being discharged per hour.Get Price

  • MCQ in Power Plant Engineering Part 8 | ME Board Exam

    Dec 19, 2020 · 379. A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3, boiler rating is 200%, boiler efficiency is 65% and heating surface area is 0.91 m 2 per bo.Hp. and the heating value of fuel is 18,400 kCal/kg. The total coal available in the bunker is 50,000 kg.Get Price

  • Heat Engine Questions and Answers | Study.com

    A steam engine takes steam from the boiler at 200deg c and exhaust directly into the air 9.65*10^4pascal at 100deg c. Calculate its maximum efficiency. View Answer An air-standard otto-cycle has a Get Price

  • Engineering Handbook For Hazardous Waste Incineration

    The off-gas at a rate of 66,000 Nm3/h leaves the afterburner chamber at a temperature of 1000°C. Heat is recovered in a steam boiler. The gases leave the boiler at 270°C. Steam is generated at 25 atm and superheated to 250°C at a rate of 34 t/h. A steam turbine generates electric power at the rate of 1320 kw/h consuming 22 t/h steam.Get Price

  • eCFR :: 40 CFR Part 60 Subpart Dc -- Standards of

    It is not necessary for fuel to be combusted continuously for the entire 24-hour period. Temporary boiler means a steam generating unit that combusts natural gas or distillate oil with a potential SO 2 emissions rate no greater than 26 ng/J (0.060 lb/MMBtu), and the unit is designed to, and is capable of, being carried or moved from one Get Price

  • Army Publishing Directorate

    heater, bituminous, trailer mtd, 3-tank car heating capacity, oil-fired steam boiler, gasoline engine driven feed water pump (cleaver brooks model spm-50m) (nsn Kefid2-7912) tacom: lo 5-3895-Kefid: active: 05/5/1967: mixer, rotary tiller: diesel engine driven; 4 wheel, pneumatic tires, self-propelled; with flat hook tines (rex chainbelt Get Price

  • MCQ in Power Plant Engineering Part 8 | ME Board Exam

    Dec 19, 2020 · 379. A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3, boiler rating is 200%, boiler efficiency is 65% and heating surface area is 0.91 m 2 per bo.Hp. and the heating value of fuel is 18,400 kCal/kg. The total coal available in the bunker is 50,000 kg.Get Price

  • eCFR :: 40 CFR Part 60 Subpart Dc -- Standards of

    It is not necessary for fuel to be combusted continuously for the entire 24-hour period. Temporary boiler means a steam generating unit that combusts natural gas or distillate oil with a potential SO 2 emissions rate no greater than 26 ng/J (0.060 lb/MMBtu), and the unit is designed to, and is capable of, being carried or moved from one Get Price

  • Compre Special Project (ppe &ipe) [vnd5gjm03rlx]

    ME Board Problem Local coal with higher heating value of 5,500 kCal/kg is burned in a pulverized coal fired boiler with 25% excess air at the rate of 25.9 M.T. per hour when the steam generated is 220 M.T. per hour. This boiler is served by 2 forced-draft fans of equal capacity delivering the air at 305 mm of water to the furnace.Get Price

  • Mechanical Engineering Problems With Solution - DocShare.tips

    Steam out Water in Q5–2 Boiler q1–2 = w1–2 (h2 – h1) + (kE2 – kE1) + PE2 – pE1) – q1–2 = h2 – h1 Heat is lost by the system to the cooling water q1–2 = h1 – h2 2. Condenser. It is used to condense steam into water. A steam turbine operating under steady state flow conditions, receives 3600Kg of steam per hour. The Get Price

Discount
7X24 Online